25-017-1
| 1 | 11 | | Resolution | A Supplemental Initial Resolution and a Resolution Authorizing and Providing for the Sale and Issuance of $96,000,000 General Obligation Sewerage System Refunding and Improvement Bonds, Series 2025E (Green Bonds - Climate Bond Certified), Levying Taxes for the Payment Thereof, and all Other Related Details | | |
Not available
|
Not available
|
25-004-1
| 1 | | | Reports | Operations and Maintenance Report for December 2024 - Pat Obenauf & Jonathan Hoisak | | |
Not available
|
Not available
|
25-005-1
| 1 | 1 | | Resolution | Restore the Executive Director’s Original Delegated Authority, Contract G98025C01, Mineral Street Overpass Green Infrastructure | | |
Not available
|
Not available
|
25-006-1
| 1 | 2 | | Resolution | Award of Contract S06050C01, Heating, Ventilation, and Air Conditioning System Improvements at South Shore Water Reclamation Facility; Change Order Request, Contract S06050D01, Engineering Services - Heating, Ventilation and Air Conditioning System Improvements in Buildings 378 and 380; Restore Executive Director’s Original Delegated Authority; and Approve Changes in Total Project Cost | | |
Not available
|
Not available
|
25-007-1
| 1 | 3 | | Resolution | Award of Contract S02017C01, Blower Branch Piping Replacement at South Shore Water Reclamation Facility, and Executive Director’s Change Order Authority for Contract S02017D01, Engineering Services - Blower Branch Pipe Replacement at South Shore Water Reclamation Facility | | |
Not available
|
Not available
|
25-008-1
| 1 | 4 | | Resolution | Award of Contract S06038C37, Primary Sludge Screens Replacement or Rehabilitation at South Shore Water Reclamation Facility | | |
Not available
|
Not available
|
25-009-1
| 1 | 5 | | Resolution | Authorize the Executive Director to Execute a Purchase Order for Material Capital Repair or Replacement 1620, Jones Island Water Reclamation Facility Return Activated Sludge Pumps Repairs | | |
Not available
|
Not available
|
25-010-1
| 1 | 6 | | Resolution | Change Order Request, Purchase Order No. 13363, Material Capital Repair or Replacement Nos. 1617 and 1631, Port Washington Road Pump Station, PS0501 Sewage Pumps 1, 2, 3, and 4, Project C98055 | | |
Not available
|
Not available
|
25-011-1
| 1 | 7 | | Resolution | Contract TS-2702, 2025 Levee System Accreditation Design and On-Call Engineering Services | | |
Not available
|
Not available
|
25-012-1
| 1 | 8 | | Resolution | Award of Contract W40009C02, Kinnickinnic River - Jackson Park Sport Courts and Soccer Fields | | |
Not available
|
Not available
|
25-013-1
| 1 | 9 | | Resolution | Change Order Request, Contract W40010E01, Design and Engineering Services for 43rd Street Ditch and Jackson Park, and Restore Executive Director’s Original Delegated Authority | | |
Not available
|
Not available
|
25-014-1
| 1 | 10 | | Resolution | Approval of the Supervisory Control and Data Acquisition Master Plan | | |
Not available
|
Not available
|
25-003-1
| 1 | | | Reports | EXECUTIVE DIRECTOR’S REPORT
A. Monthly Reports
B. Staff Recognition (Kevin Shafer)
C. Great Bubble Barrier Feasibility Study for the Menomonee River (Matt Magruder)
D. Report on Per- and Polyfluoroalkyl Substances (PFAS) Regulations (Pete Coffaro & Micki Klappa-Sullivan)
E. Update on Discussions with Milwaukee County Parks (Kevin Shafer) | | |
Not available
|
Not available
|