Title
Change Order Request to Purchase Order No. 10584, Material Capital Repair or Replacement Nos. 1125, Inline Storage System Dropshaft Site, NS12; 1147, Inline Storage System Dropshaft Site, NS09; and 1203, Diversion Chamber DC0705 Hydraulic Gate Cylinder Replacement, and Restore the Executive Director’s Original Delegated Authority, Project C98055
Body
RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the Executive Director is authorized to execute a change order to Purchase Order No. 10584, Material Capital Repair or Replacement Nos. 1125, Inline Storage System Dropshaft Site, NS12; 1147, Inline Storage System Dropshaft Site, NS09; and 1023, Diversion Chamber DC0705 Hydraulic Gate Cylinder Replacement, with Veolia Water Milwaukee, LLC, in an amount not to exceed $69,719, and that the Executive Director’s delegated authority for Project C98055 is restored.