File #: 20-104-7    Version: 1 Name:
Type: Resolution Status: Adopted
File created: 6/29/2020 In control: Operations Committee
On agenda: 7/13/2020 Final action: 7/27/2020
Title: Authorizing the Executive Director to Execute a Purchase Order for Material Capital Repair or Replacement No. 1254, PS0401 Metropolitan Interceptor Sewer Sluice Gate 1 Replacement, and Material Capital Repair or Replacement No. 1256, PS0302 Metropolitan Interceptor Sewer Diversion Gate Structure Repair, and Approve Change in Total Project Cost
Sponsors: Executive Director
Attachments: 1. 03_OP_Auth_Purchase_MCRR_1254_1256_PS_Gates_legislative_file.pdf, 2. 03_OP_Auth_Purchase_MCRR_1254_1256_PS_Gates_fiscal note.pdf, 3. 03_OP_Auth_Purchase_MCRR_1254_1256_PS_Gates_SWMBE.pdf

Title

Authorizing the Executive Director to Execute a Purchase Order for Material Capital Repair or Replacement No. 1254, PS0401 Metropolitan Interceptor Sewer Sluice Gate 1 Replacement, and Material Capital Repair or Replacement No. 1256, PS0302 Metropolitan Interceptor Sewer Diversion Gate Structure Repair, and Approve Change in Total Project Cost

Body

RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the Executive Director is authorized to execute a purchase order with Veolia Water Milwaukee, LLC, for Material Capital Repair or Replacement No. 1254, PS0401 Metropolitan Interceptor Sewer Sluice Gate 1 Replacement, and Material Capital Repair or Replacement No. 1256, PS0302 Metropolitan Interceptor Sewer Diversion Gate Structure Repair, in an amount not to exceed $273,339.

 

FURTHER RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the total project cost for Project C98055, Conveyance Equipment Replacement, is increased by $273,339 for an amended total project cost of $873,339, and that a corresponding change is made to the total project costs for Project C99001, Allowance for Cost and Schedule Changes.